|
GAS TURBINE CONTROLS CORPORATION
466 Saw Mill River Road
Ardsley, NY 10502
Tel: +1 914 693 0830
Fax: +1 914 693 3824
Email Us:
sales@gasturbinecontrols.com
|
Speedtronic Mark VI Maintenance

Back to seminars
DAY 1:
- Introduction Speedtronic Mark VI
- GE Gas Turbine Fundamentals and control basics.
- Speedtronic Mark VI hardware
- Panel, modular concept discussion
- Mark VI cards
- Internal and external Mark VI wiring
- Hardware documentation
- The main protection system VPRO
- Supply voltage.
DAY 2
- Data structure of the operator interface <HMI>
- Brief discussion of the Windows 2000/XP based operator
interface
- Most important files of the operator interface and their
function
- Failure of the operator interface, what to do.
- Communications with the operator interface, Ethernet and DCS
communications
- Operator interface facilities, TOOLBOX and Cimplicity
- Watch Windows
- The M6B file, functions, modules and tasks
- The Finder
- Trip log
- Alarm display
- Trouble shooting procedure
- Control constants
- Mark VI tools (TOOLBOX practice)
- Trend Recorder Historical trip display Alarms and SOE's
DAY 3:
- Mark VI software structure
- M6B file, MKVI I/O and functions Programming languages of
the Mark VI
- Macro's and Modules
- Practice: Making Mark VI software with TOOLBOX
- Digital input.
- Analog input with software by students
- Digital input with software example by Students
- Gas turbine sequence
- Control modes
- Start up and permissive for start
- IGV sequence
- Normal stop
- Emergency stop
- Discussion of the following controls and sequencing
- Fuel control
- Start up, Speed, Acceleration, Temperature, Shut-down
control and Manual FSR control Special control loops Inlet Guide
Vane, Anti icing, Water / steam injection and Start and stop
control loops.The protection systems, Flame detection, Overspeed,
Vibration, Exhaust temperature, Lube oil pressure and
temperature, Fire protection system.
- Discussion of the following controls and sequencing
- Synchronization, auto and manual Power factor control MVAR
control
- Dry Low NOx
- Explanation of the system
- Discussion of the controls, implementation in Mark VI
controls and logics
DAY 4
- Trouble shooting, alarm analysis and limited software
changes in practice:
- Diagnostics of card failure - Card replacement procedure
- .Alarm display-Setup and configuration
- Alarm Management (flow chart explanation)
- Exercise of different simulated alarms trouble shooting
- Changing control constants, adding alarms
- Trip Log display and interpretation.
DAY 5
- Trouble shooting, actual situations
- Case study: Unit "not ready to start" .Start Checks, Trip
logs. First failure analyses for trips (emergency stop)
- Class Discussion and Evaluation of the course

|
The 5-day Maintenance course is designed for experienced instrument
personnel involved in the daily maintenance of the Mark VI control
systems.
|