|
GAS TURBINE CONTROLS CORPORATION
466 Saw Mill River Road
Ardsley, NY 10502
Tel: +1 914 693 0830
Fax: +1 914 693 3824
Email Us:
sales@gasturbinecontrols.com
|
Speedtronic Mark VI Controls Course
|
Back to courses |
|
| |
|
|
Description:
|
This program is intended for all control technicians and engineers,
no matter their level of experience. The training will offer the
attendees in-depth knowledge to work with the Mk VI control system
in application with the gas turbine. This training will familiarize
them with the hardware and software components of the control
system. It will develop strong skills in process alarm
troubleshooting and analysis of the control code. Additional
training includes LVDT calibration, control interface (Cimplicity
HMI) software programming, sequence editing and diagnostic alarm
troubleshooting. A Mark VI simulator will be used to provide the
participants with some hands on training.
|
| |
|
|
|
10.0 Days |
| |
|
|
|
Day 1
Course outline / objectives
Equipment review
Overview of turbine / control systems
GE documentation conventions
Control Specs
Piping Schematics
I/O report
Panel / network layout
Day 2
Controls Fundamentals
TMR operation / design philosophy
Panel layout
Introduction to operator interface(HMI) configuration
Day 3
HMI / Mk VI file structure
Operator interface (HMI) displays
Introduction to graphics application software (Cimplicity)
Introduction to controller application software (Toolbox)
Exercise:
Finder (the application software search engine)
Day 4
Introduction to software configuration
Exercise:
Signal Tracing VPRO configuration / protection software
Blockware concepts and diagrams
Day 5
Blockware functions and algorithms
Exercise:
Alarm Trace #1
Alarm Trace #2
Alarm Trace #3
Day 6
Forcing signals / changing control constants
Exercise:
Toolbox: Logic and Analog Forcing / Control Constants
Introduction to signal data base (SDB) Exercise:
Using the SDB
Day 7
Hardware configuration
LVDT calibration procedure
Exercise:
LVDT Calibration
Day 8
Sequencing editing
Adding software changes
Validation / build /download
Exercise:
Adding I/O and Alarm
Cimplicity #2
Adding a Macro
Day 9
Troubleshooting / diagnostics
Exercise:
Toolbox: “Ready to Start”
Trending
Exercise:
Toolbox: Trending
Day 10
Trip history
Mk VI toolbox graphics / data collection
Questions & Answers / Review / Final Test
|
|
|

|
|