|
GAS TURBINE CONTROLS CORPORATION
466 Saw Mill River Road
Ardsley, NY 10502
Tel: +1 914 693 0830
Fax: +1 914 693 3824
Email Us:
sales@gasturbinecontrols.com
|
Mark II Speedtronic Maintenance
|
Back to courses |
|
| |
|
|
Description:
|
N/A
|
| |
|
|
|
10.0 Days |
| |
|
|
|
Mark II Speedtronic
Control Principles
- Digital Control Elements
- Analogue Control Elements
- Fuel Control
- Gas Fuel Control
- Speed Control
- Temperature Control
- Master Protection
- Digital Setpoint (Governor)
- Liquid Fuel Control
Mark II Speedtronic Control Sequencing
- On-Base Permissive Signals
- MCC Sequencing
- Input and Output Signals
- Turbine Start Sequencing
- Master Protection
- Turbine Starting Means
- Ratchet Turbine Control Sequencing
- Atomizing and Fuel Purge
Mark II Speedtronic Control Calibration
- Speed Control
- Temperature Control
- Fuel Splitter
- Liquid Fuel Control
- Gas Fuel Control
- Start-up Control
- Ground Fault Detection
- Vibration Protection
- Flame Detection
Mark II Speedtronic Control Troubleshooting
- Introduction
- Speedtronic Power Modules
- Control Function
- Protection Systems
- Power Supply System
- Panel Field Energizing
- Troubleshooting
|
|
|

|
|