|
GAS TURBINE CONTROLS CORPORATION
466 Saw Mill River Road
Ardsley, NY 10502
Tel: +1 914 693 0830
Fax: +1 914 693 3824
Email Us:
sales@gasturbinecontrols.com
|
Gas Turbine Operations
(Mark V Controls)
|
Back to courses |
|
| |
|
|
Description:
|
N/A
|
| |
|
|
|
5.0 Days |
| |
|
|
|
- Introduction (Major
Components of the Gas Turbine)
- Description of Piping Schematics
- Checks before start-up
- Overview of Speedtronic Control System
- Start-up and Shutdown Sequences(Simulator)
- Synchronizing
- Loading and Unloading (Simulator)
- Processing Alarms (Simulator)
- Special Operations
Water Wash (Simulator)
Overspeed Test (Simulator)
- Use of Real Time Plot (Simulator)
- Basic Fault Finding
Trip Log Display (Simulator)
Dynamic Rung Display (Simulator)
- Course Review
|
|
|

|
|