|
GAS TURBINE CONTROLS CORPORATION
466 Saw Mill River Road
Ardsley, NY 10502
Tel: +1 914 693 0830
Fax: +1 914 693 3824
Email Us:
sales@gasturbinecontrols.com
|
Gas Turbine Operations (Mark II Controls)
|
Back to courses |
|
| |
|
|
Description:
|
|
| |
|
|
|
5.0 Days |
| |
|
|
|
- Introduction (Major
Components of the Gas Turbine)
- Description of Piping Schematics
- Checks before start-up
- Introduction to Control Panel
- Overview of Speedtronic Control System
- Major Control Loops
- Start-up, Speed, Temperature Annunciations
- Protection Systems
- Start-up and Shutdown Sequences
- Practical Exercises on Control Panel and Simulator
- Generator Control and Excitation
- Synchronizing and Loading
|
|
|
 |
|